Monolithic structure

Walls and slabs poured in a single day.

Aluminum formwork

The group operates aluminum formwork from the MFE Formwork Technology and Wall Ties & Forms systems, with 1,500 units of each in its own inventory. It is assembled, poured and stripped in closed cycles.

The resulting structure has no cold joints between wall and slab: it is a single piece. Rigidity, durability and repeatability measured project after project.

Monolithic concrete structure on site

A single process

More speed. More repeatability. The same control.

units of each system
1,500
Our own inventory of MFE and Wall Ties & Forms.
closed cycle
24 h
Assembly, pour and strip in each cycle.
wall-to-slab cold joints
0
A monolithic structure in a single piece.

Parts of the system

  • PVC windows

    Our own factory, with glazing criteria set for each pane.

  • Furniture

    Kitchens, closets and fixed fittings, from design to installation.

Every capability we needed, we learned to build. And we keep going.

Let’s build what comes next.