Monolithic structure
Walls and slabs poured in a single day.
Aluminum formwork
The group operates aluminum formwork from the MFE Formwork Technology and Wall Ties & Forms systems, with 1,500 units of each in its own inventory. It is assembled, poured and stripped in closed cycles.
The resulting structure has no cold joints between wall and slab: it is a single piece. Rigidity, durability and repeatability measured project after project.

A single process
More speed. More repeatability. The same control.
- units of each system
- 1,500
- Our own inventory of MFE and Wall Ties & Forms.
- closed cycle
- 24 h
- Assembly, pour and strip in each cycle.
- wall-to-slab cold joints
- 0
- A monolithic structure in a single piece.
Parts of the system
PVC windows
Our own factory, with glazing criteria set for each pane.
Furniture
Kitchens, closets and fixed fittings, from design to installation.

Every capability we needed, we learned to build. And we keep going.