The system
Building fast without losing technical control.
And manufacturing what can’t be left to chance.
What a developer hires
You don’t hire a stage. You hire the capacity to execute.
Our own construction system, factories and crews working on the same site.
01 · Execution
In-house site management
Our own crews, logistics and payroll to sustain simultaneous work fronts and answer for deadlines.
02 · System
Aluminum formwork
Walls and slabs in a single monolithic process, with 1,500 units of each system in inventory.
03 · Components
Our own factories
PVC windows and furniture made by the group, within the same construction package.
A single process
More speed. More repeatability. The same control.
- units of each system
- 1,500
- Our own inventory of MFE and Wall Ties & Forms.
- closed cycle
- 24 h
- Assembly, pour and strip in each cycle.
- wall-to-slab cold joints
- 0
- A monolithic structure in a single piece.
Parts of the system
Three capabilities, one project.
Aluminum formwork
Walls and slabs in a single piece, in closed cycles.
PVC windows
Our own factory, with glazing criteria set for each pane.
Furniture
Kitchens, closets and fixed fittings, from design to installation.

Every capability we needed, we learned to build. And we keep going.